Fiocchi 32 S&W Long Lead Wadcutter Ammunition FI32LA 100 Grain CASE 1000 rounds

$800.00

Per Round Cost: 0.800
SKU:FI32LACASE
UPC:4073460472
Weight:24.00 LBS
Caliber:32 S&W Long
Bullet Weight:100 Gr
Bullet Type:Wadcutter
Case Type:Brass

Description

Rate this product
  • Fiocchi Shooting Dynamics ammunition offers great quality and consistency for the high-volume shooter and hunter. Loaded with similar grain weights as the Exacta line, this ammunition is perfect for training and practicing with similar results at a much cheaper price. This allows you to shoot, plink, or hunt as much as possible. This ammunition is new production, non-corrosive, in boxer-primed, reloadable brass cases.

    Notes:

  • Packaging is marked “32 Wad Cutter 100 Gr. GZG”
  • Headstamp is G.F.L. 32 Wad Cut.

    Technical Information

  • Caliber: 32 S&W Long
  • Bullet Weight: 100 Grain
  • Bullet Style: Lead Wadcutter
  • Case Type: Brass

    Ballistics Information:

  • Muzzle Velocity: 730 fps
  • Muzzle Energy: 120 ft. lbs.

Fiocchi 32 S&W Long Lead Wad Cutter FI32LA 100gr LWC CASE 1000 rounds

FI32LA,FI32LABRICK,FI32LACASE,FI32LAX

Fiocchi 32 S&W Long Lead Wad Cutter FI32LA 100gr LWC CASE 1000 rounds

Reviews

There are no reviews yet.

Be the first to review “Fiocchi 32 S&W Long Lead Wadcutter Ammunition FI32LA 100 Grain CASE 1000 rounds”

Your email address will not be published. Required fields are marked *